Technique
For depths of less than 20 metres, an excavator is generally used to dig a low permeability slurry wall in a highly efficient process. The excavated materials are mixed with clay and bentonite and then used as fill as appropriate. The technique therefore generates very little spoil. It delivers very low values of permeability, in the order of 10-7 to 10-9 ms.